Hi, sorry if my question seems stuipid, but im trying to understand what is involved here to get it right.
Im about to commence repairing the drip rail on my LJ above the rear door down the C pillar. the old piece is off and the area repaired. When installing the new section of drip rail should seam sealer be used between the drip rail and body then screw into place before spot welding or just spot weld and seam seal the outside once done ? Just not sure about the application of the seam sealer
Thanks in advance